Grants Available for Drought Response in Western US

The United States Bureau of Reclamation (Reclamation), through its WaterSMART Drought Response Program NOFO, invites eligible applicants to submit proposals for projects designed to improve drought resilience by developing effective water management strategies and drought contingency plans. Funding under the Drought Response Program supports a range of initiatives including infrastructure improvements for increased water storage and distribution capabilities, water source diversification, decision-making tools for water management, and comprehensive planning to prepare for and respond to drought conditions. Up to $13.5 million in total funding is available, with individual grants ranging from $25,000 to $1.5 million, and a 50 percent cost share required. Applications are due July 28, 2026.

What is the program’s purpose?

The objective of the WaterSMART Drought Response Program NOFO is to invite eligible applicants to leverage their money and resources by cost sharing with Reclamation on drought resiliency and planning projects designed to increase water management flexibility and reliability, helping entities prepare for and address impacts of drought and water supply shortages. Projects funded under this NOFO are proactive measures to build long-term drought resiliency. In general, projects will increase water supply reliability and build long-term resilience to drought. Proposed projects should aim to reduce the need for emergency drought response actions, such as water hauling programs and temporary infrastructure, while providing sustained benefits that build long-term resilience.

This NOFO provides funding under two task areas: Task A: Infrastructure Projects and Task B: Water Management and Planning Projects.

Who is eligible to apply?

Category A Applicants:

  • States, Indian tribes, irrigation districts, water districts;
  • State, Regional, or local authorities whose members include one or more organizations with water or power delivery authority; and
  • other organizations with water or power delivery authority.

All Category A applicants must be located in the Western United States or United States Territories, including Alaska, Arizona, California, Colorado, Hawaii, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Texas, Utah, Washington, Wyoming, American Samoa, Guam, the Northern Mariana Islands, the Virgin Islands, and Puerto Rico.

Category B Applicants:

Nonprofit conservation organizations that are acting in partnership with, and with the agreement of an entity described in Category A. Category B applicants should include with their application a letter from the Category A partner stating that the Category A partner:

  • Is acting in partnership with the applicant;
  • Agrees to the submittal and content of the application; and
  • Intends to participate in the project in some way, for example, by providing input, feedback, or other support for the project.

Partners do not necessarily need to contribute cost share funding. All Category B applicants must be located in the United States or the specific Territories identified above.

Ineligible Applicants:

Those not eligible include the following entities:

  • Federal Governmental Entities
  • Individuals
  • Institutes of higher education

What projects are eligible for funding?

This NOFO provides funding under two task areas: Task A: Infrastructure Projects and Task B: Water Management and Planning Projects.

Task A: Infrastructure Projects

Investments in infrastructure improve drought resiliency by increasing water management flexibility and providing alternative sources of water supply. Infrastructure projects include, but are not limited to the following:

  • System modifications or improvements. Projects that will increase flexibility of water conveyance and deliveries, facilitating access to water supplies in times of drought. Projects include, but are not limited to: constructing or modifying surface water intakes to access supplies when water levels are low (e.g., at dead pool), or to allow access at different locations; constructing new conveyance system components (pipelines, canals, pumping plants, etc.) to increase delivery flexibilities, facilitate voluntary water marketing, or to deliver water from alternative sources; constructing connections between water delivery systems to provide more options for water conveyance; and/or installing barriers or other facilities to prevent saltwater intrusion into surface supplies.
  • Storing water and/or recharging groundwater supplies. Projects that enable the capture or storage of additional water supplies that can be made available during drought. Projects include, but are not limited to: developing or expanding surface water storage facilities such as off-stream storage ponds; installing water towers and storage tanks to store water for municipal and domestic use; and/or installing recharge ponds or injection wells to increase recharge and storage of surplus, inactive, or reclaimed water for later beneficial use. Multiple recharge basins or injection wells in one application will be considered as one project (or a phase of a larger project, if applicable). Storage projects have cost limitations for eligibility under this NOFO.
  • Developing Alternative Water Supply Sources Through the Treatment and Reuse of Surface Water and Reclaimed Water. Projects that develop alternative water supplies to build drought resiliency. Projects include, but are not limited to: constructing or expanding water treatment facilities to treat impaired surface water, municipal wastewater or stormwater runoff for later beneficial use; constructing stormwater capture and reuse systems, including stormwater infrastructure solutions such as rain gardens, cisterns, and bioswales; and/or installing residential grey water and rain catchment systems. Water reclamation, reuse, and desalination projects have eligibility limitations under this NOFO.
  • Groundwater Recovery and Treatment Projects. Projects that implement the sustainable use of groundwater or the recovery of recharged water to build drought resiliency. Projects include, but are not limited to: constructing or rehabilitating a well to provide back-up water supplies during times of drought; constructing an extraction well at groundwater banks or other recharge areas to improve extraction and return capabilities during dry years; constructing an aquifer storage and recovery well; treating impaired groundwater for beneficial use. Applications for groundwater projects (including rehabilitation and the treatment of well water) will be limited to two wells per applicant. If two wells are included in the same application the wells must be located within the applicant’s service area. This limitation does not apply to monitoring or injection wells.

Task B: Water Management and Planning Projects

Task B projects are intended to help entities better manage water supplies through decision support tools, modeling, the identification of potential strategies to address drought, and comprehensive drought planning. Projects include but are not limited to the following:

  • Developing water management, water marketing, and modeling tools to help communities evaluate options and implement strategies to address drought.
  • Developing or updating Drought Contingency Plans (comprehensive drought plans) that, when implemented, will increase water reliability and improve water management through the use of expanded technologies for drought forecasting, planning mitigation actions, and identifying drought response actions. Proposed Drought Contingency Plans should be divided into two phases (Phase I and Phase II): Phase I includes the establishment of a drought planning task force, development of a detailed work plan, and development of a communication and outreach plan. Phase II begins after the detailed work plan is accepted by Reclamation. In Phase II, the planning lead develops the plan or plan update including the required Drought Contingency Plan elements.

A full list of ineligible projects can be found beginning on page 9 of the NOFO.

What are the funding amounts and application deadlines?

Reclamation expects to award approximately 8-20 awards, with individual award amounts ranging from $25,000 to $1.5 million. Applicants must provide at least 50 percent of the total project costs. The first application is due July 8, 2026, and the second application is due April 13, 2027.

 

The full NOFO can be found here.

 

For more information on this grant or how to apply with Morrison’s assistance, please contact the Morrison Grants Team by email at grants@morrisonco.net or call us at 530-893-4764.

Questions?

We’ve worked with a wide variety of clients on a broad range of projects and are happy to discuss solutions that can best fit your needs.

Get in Touch